
A1: complete weekend closure between Ascheberg and Münster-Hiltrup
The A1 will be closed in order to install prefabricated superstructure components of a motorway bridge in the Münsterland.
The installation of the overpass along Amelsbürener Straße (K39) is part of the investment project of widening the section of the A1 between Münster-Hiltrup and Ascheberg to six lanes. The closure begins today at 10 PM and will last until 5 AM on Monday (March 20).
Diversion routes
Long-distance traffic from the north is diverted from the Lotte motorway intersection via the A30, A33 and A2 to the Kamener intersection. Long-distance traffic from the south is diverted along the same route in the opposite direction. Another diversion for traffic from the Münsterland starts from Münster-Süd via the A43 and the A2 to the Kamener intersection. The same route is available for traffic in the opposite direction. Local diversions towards the south start from Münster-Hiltrup via the U26a and towards the north from Ascheberg via the U83. The new Amelsbürener Strasse overpass is expected to be reopened by the end of May.
Latest Posts
Easter truck driving bans in Poland. One provision makes the difference
During the Easter period in Poland, additional traffic bans apply to trucks with a gross vehicle weight exceeding 12 tonnes. The restrictions will cover...
Romania will shut down the toll system. Drivers will not be able to buy a vignette
CNAIR has announced a planned technical interruption that will affect the ability to purchase vignettes and pay road tolls in Romania.On Wednesday, April 8,...
Major disruptions ahead in Germany – A2 motorway closed, A4 with night closures
April brings significant disruptions on German motorways. According to Die Autobahn GmbH des Bundes, the A2 motorway in Dortmund will be completely closed...