
A1: complete weekend closure between Ascheberg and Münster-Hiltrup
The A1 will be closed in order to install prefabricated superstructure components of a motorway bridge in the Münsterland.
The installation of the overpass along Amelsbürener Straße (K39) is part of the investment project of widening the section of the A1 between Münster-Hiltrup and Ascheberg to six lanes. The closure begins today at 10 PM and will last until 5 AM on Monday (March 20).
Diversion routes
Long-distance traffic from the north is diverted from the Lotte motorway intersection via the A30, A33 and A2 to the Kamener intersection. Long-distance traffic from the south is diverted along the same route in the opposite direction. Another diversion for traffic from the Münsterland starts from Münster-Süd via the A43 and the A2 to the Kamener intersection. The same route is available for traffic in the opposite direction. Local diversions towards the south start from Münster-Hiltrup via the U26a and towards the north from Ascheberg via the U83. The new Amelsbürener Strasse overpass is expected to be reopened by the end of May.
Latest Posts
September 15 with exemption from truck bans in Slovakia
The Presidium of the Slovak Police has reviewed the request of the Road Haulage Association of the Slovak Republic, CESMAD Slovakia, and has granted a...
September 15 with exemption from truck bans in Slovakia
Nighttime closures of the Van Brienenoord Bridge on the A16 in Rotterdam – detours and disruptions
In mid-September, drivers will face major disruptions on the A16 motorway in Rotterdam. Due to maintenance works, the Van Brienenoord Bridge will be closed...
Bulgaria: August Restrictions for Trucks on the Trakia Motorway
In August, Bulgaria is introducing additional traffic restrictions for heavy goods vehicles over 12 tonnes on the Trakia Motorway (A1), on the section...